Containerized Data Center Solution
Site-independent, factory-built data centers for rapid deployment anywhere.
The Problem
Customer Challenge
Telecom operators, mining and oil & gas companies often need data center capacity at remote or temporary sites where conventional building construction is slow, costly, or impossible.
The Approach
Solution Architecture
Wandtung integrates IT cabinets, power distribution, UPS, cooling, fire protection, security and monitoring inside a reinforced, insulated ISO container shell, engineered for outdoor deployment and rapid connection to site power and network.
System
System Components
Container Structure
Insulated, IP55-rated shell rated for outdoor deployment.
IT & Power
Configurable IT cabinets with intelligent PDU and modular UPS.
Cooling
Precision air conditioning or liquid cooling for higher density.
Safety & Security
Fire suppression, access control and CCTV-ready infrastructure.
Architecture
How It Works
- 1
Container is fitted out and function-tested at the factory as a complete data center.
- 2
Unit is transported to site by standard container logistics.
- 3
On-site work is limited to foundation, power/network connection and commissioning.
- 4
Multiple containers can be linked for larger capacity requirements.
Configuration
Product Configuration
40ft Container Data Center
Fully pre-integrated 40-foot containerized data center for rapid, large-scale deployment.
Modular UPS
Hot-swappable power module UPS for scalable, high-availability critical power.
Intelligent PDU
Network-managed rack power distribution with monitoring, metering and remote switching.
Advantages
Technical Advantages
- Deployment timelines measured in weeks, not months
- Site-independent — suitable for remote, temporary or emergency locations
- Scalable by adding container units as capacity needs grow
Process
Deployment Process
Step 1
Requirements Definition
Confirm IT load, environment and logistics constraints.
Step 2
Container Engineering
Design container layout, power and cooling configuration.
Step 3
Factory Integration & Test
Build and fully test the container as a system.
Step 4
Transport & Site Placement
Ship and position the container at the deployment site.
Step 5
Commissioning
Connect utility/network and verify full-system operation.
Deployment
Typical Applications
FAQ
Frequently Asked Questions
Yes. Wandtung manufactures 20ft and 40ft containerized data centers pre-integrated with IT cabinets, power distribution, UPS, cooling, fire protection and monitoring for telecom, mining, oil & gas, edge computing and government deployments.
Request This Solution
Tell us about your project and our engineering team will propose a configuration matched to your site requirements.