Wandtung

Data Center Infrastructure Solution

A complete, coordinated infrastructure stack from utility power to the rack.

The Problem

Customer Challenge

Operators building or expanding a data hall must coordinate power distribution, UPS, cabinets, cooling, cable management and monitoring from multiple vendors — a process prone to integration gaps, mismatched capacity planning and schedule risk.

The Approach

Solution Architecture

Wandtung designs the full infrastructure stack as one coordinated system: utility/generator input feeds redundant UPS, power is distributed to racks through intelligent PDUs, IT load sits in engineered cabinets with hot/cold aisle containment, precision or liquid cooling removes heat, and a monitoring layer ties power, environment and security together.

System

System Components

UPS & Power Distribution

Modular UPS and intelligent PDUs sized to redundancy target (N, N+1, 2N).

Cabinets & Containment

Data center cabinets with hot/cold aisle containment for airflow separation.

Cooling

Precision air conditioning or liquid cooling matched to rack density.

Cable Management

Structured overhead tray and underfloor routing for power and data.

Monitoring

DCIM-compatible monitoring across power, environment and access control.

Architecture

How It Works

  1. 1

    Utility and generator power feeds into redundant UPS systems.

  2. 2

    UPS output is distributed to racks via intelligent PDUs with outlet-level monitoring.

  3. 3

    IT load is housed in cabinets with hot/cold aisle containment to isolate supply and return air.

  4. 4

    Precision or liquid cooling removes heat load, sized to rack density.

  5. 5

    A monitoring layer aggregates power, environmental and access data for facility operations.

Configuration

Product Configuration

Advantages

Technical Advantages

  • Single engineering point of accountability across power, cooling and enclosure systems
  • Capacity planning coordinated across UPS, PDU and cooling from day one
  • Factory testing of major subsystems before site delivery

Process

Deployment Process

  1. Step 1

    Requirements & Load Assessment

    Define IT load, redundancy target and site constraints.

  2. Step 2

    System Design

    Engineer power, cooling and cabinet layout as one coordinated architecture.

  3. Step 3

    Manufacturing & Factory Testing

    Build and test major subsystems before shipment.

  4. Step 4

    Site Delivery & Installation

    Deliver, install and integrate systems on site.

  5. Step 5

    Commissioning & Handover

    Full-load commissioning, documentation and operator training.

Deployment

Typical Applications

Enterprise data centersColocation facilitiesGovernment and financial data halls

FAQ

Frequently Asked Questions

Yes. Wandtung engineers coordinated power, cooling, enclosure and monitoring systems as a single infrastructure solution, sized and integrated together rather than sold as disconnected components.

Request This Solution

Tell us about your project and our engineering team will propose a configuration matched to your site requirements.